Search

On-Site Waste Treatment

We also perform on-site waste treatment.

Advanced Environmental Solutions offers a unique on-site treatment process using a stabilization technology that renders certain characteristic wastes non-hazardous. Liquid, sludge and solid hazardous wastes with heavy metals can be treated on-site, and corrosive wastewaters can be cost-effectively treated onsite to neutralize acidity or alkalinity. We understand the most subtle nuances of on-site waste treatment and the often unapparent aspects of permitting. By eliminating the need to send materials to a hazardous waste TSDF, this process can minimize your hazardous waste generation, your disposal costs and your liability.

This can significantly reduce operational costs.

On-site waste treatment is an example of how sustainability initiatives can help create a competitive advantage, because it can reduce both the hard costs and soft costs associated with disposal and transportation costs. The wastes that a generator can treat on site and without a permit are limited primarily to characteristically hazardous wastes so as to render such waste nonhazardous or less hazardous, safer to transport, store, or dispose of; or amenable for recovery, amenable for storage, or reduced in volume. On-site waste treatment includes the capacity to:

  • Neutralize Acidic or Alkaline Wastewaters: Instead of shipping drums or tankers of corrosive wastewaters, neutralization of the wastes can be a very cost-effective method of management. Once the wastes are neutralized, they can either be discharged at your facility or shipped off-site as non-hazardous wastewater.
  • Precipitate and Solidify Heavy Metals: Liquid, sludge and solid hazardous wastes with heavy metals can be treated on-site. Successful treatment will remove the heavy metal EPA Waste Codes rendering the material non-hazardous. These materials can often be solidified and sent to local special waste landfills or to secured chemical landfills.

Testimonials

CH2M HILL would like to express our thanks to Advanced Environmental Solutions, Inc. (AES) and particularly, Sam Houston, Site Superintendent, for your work on the above referenced project as a subcontractor to CH2M HILL.
Jeffrey Minchak
CH2M HILL
I have worked with Advanced Environmental Solutions, Inc. (AES) for nearly 15 years on various environmental projects in New Mexico and Texas. I have always been very satisfied with their job performance and their ability to respond even on very short notice.
Gary Henderson
Environmental Resources Management
Since 2008, Advanced Environmental Services (AES) has assisted January Environmental on several projects including waste disposal, Oil Water Separator maintenance, Oily Water pumping and disposal at various sites throughout New Mexico.
Josh Reynolds
January Environmental